Development of Framework for Automated Progress Monitoring of Construction Projects

Team

Akash Pushkar
Akash Pushkar 1
Koshy Varghese
Koshy Varghese1

1Indian Institute of Technology, Madras


Abstract

Automated progress monitoring of on-going construction projects have been an area of interest for researchers in the field of civil engineering. It is done using 3D point cloud asbuilt and as-planned model. Advancements in the field of photogrammetry and computer vision have made 3D reconstruction of buildings easy and affordable. But the high variability of construction sites, in terms of lighting conditions, material appearance, etc. and error-prone data collection techniques tend to make the reconstructed 3D model erroneous and incorrect representation of the actual site. This eventually affecting the result of progress estimation step. To overcome these limitations, this study presents a novel approach for improving the results of 3D reconstruction of a construction site by employing two-step process for the reconstruction as compared to the traditional approach. In the proposed method, the first step is to obtain an as-built 3D model of the construction site using 3D scanning techniques or photogrammetry in the form of point cloud data. In the second step, the model is passed through pre-trained machine learning binary classification model for identifying and removing erroneous data points in the captured point cloud. Erroneous points are removed by identifying the correct building points. This processed as-built model is compared with an as-planned model for progress estimation. Based on this, experiments are carried out using commercially available stereo vision camera for 3D reconstruction. Moreover this study, standardizing the methodogy of data collection at a construction site using a testbed laboratory setup. It is used to generate data for benchmarking.


Important links


Dataset collection using laboratory setup

3D reconstruction
Data collection under constraint condition

3D models

Below is the examples of the as-built and as-planned 3D models collected and analysed in the study

As-built model

As-built model

As-planned model


Implementation

Methodology
As-built laboratory setup
As-planned model(w/ lighting profile)

Results


Have comments or questions about the project? Please let us know here